Designed and Built Shelves for the BHS Baseball Team’s Dugout

« Back to Client Connected Projects

Project Attributes

School: Belton High School

Class: Architecture & Construction

Instructor: Kevin Rushing

Client: Coach Tommy Coovert

Problem: Coach Coovert needed a solution to player;s belongings lying all over the dugout floor.

The client approached us about doing a project for the varsity baseball team. The students then measured the dugout and with the client’s requests, set out to build the shelves.

I believe our CCP went well. While it was the first for my class and me, it went smoothly because I teach a construction class, which lends well to providing a service. The students worked well as a team and were proud of the final product.

Advice? Don’t be afraid to start small. Our first CCP was in-house with the baseball team. I would like to maybe next year, look outside the school for a project.

Learning Standard

  • I can safely and effectively use a compound miter saw, a drill, and an orbital sander.